Solar Power

 

With the inverters located out at the panels, we needed a trench to bring the AC power back to the houses main panel. It was about a 200 foot long trench and required 6AGW copper wire to carry the load.

 

 

It took almost two months from the time we received the permits for the solar modules to arrive . It seems that the Germans started an incentive program that created such a great demand that no one had them in stock. I could have settled for lesser quality modules, but I decided to wait and get the Sharp 185's. This picture was taken the day they arrived. Bob and his workers were right on top of things as usual.

 